Substation Groundman MasTec Utility ServicesSubstation GroundmanEL PASO, TexasFull timeResponsibilities: Work safely while assisting in new/existing construction and various tasks such as demolition, site preparation, excavating, backfilling and landscaping, trenching, pole setting, cable labelling, and other substation related tasks such as construction clean-up. Overview: E nergy Erectors, Inc. (EEI - A MasTec Company) tackles terrain, technology, and timelines to construct transmission line projects up to 500 kV and has over 30 years of experience building substations and switchyards.
NewGeneral Laborers MGC ContractorsGeneral LaborersEl Paso, TXFull timeThe stamina to maintain attention despite interruptions, ability to lift, push, pull, carry, handle or feel objects, supplies, tools, machinery and/or controls weighing up to 50 pounds and reach with hands and arms; climb stairs and/or ladders; balance, bend, stoop, kneel, crouch, crawl, lift overhead, traverse around or otherwise position one's self around the required work and safety requirements to navigating and perform activities on various construction sites in a safe manner. We specialize in all forms of water and wastewater general contracting including Job Order Contracting, Construction Manager at Risk, Design-Bid-Build, and Design-Build throughout Arizona, Texas, Utah, and New Mexico.
SUB Groundman MasTec Advanced TechnologiesSUB GroundmanEL PASO, TXWork safely while assisting in new/existing construction and various tasks such as demolition, site preparation, excavating, backfilling and landscaping, trenching, pole setting, cable labelling, and other substation related tasks such as construction clean-up. Energy Erectors, Inc. (EEI - A MasTec Company) tackles terrain, technology, and timelines to construct transmission line projects up to 500 kV and has over 30 years of experience building substations and switchyards.
Concrete Foreman Straight Edge ContractorsConcrete ForemanEl Paso, Texas$20–$30Straight Edge Contractors LLC is seeking an experienced Concrete Foreman to lead our concrete crews on commercial and civil construction projects throughout the El Paso area. Oversee excavation, subgrade preparation, forming, reinforcing steel placement, and concrete placement.
Electrical Assistant Project Manager I (34017) CEC Facilities GroupElectrical Assistant Project Manager I (34017)El Paso, TXThis job may work inside or outside with possible exposure to extreme hot or cold temperatures and weather elements in restricted or confined spaces, and on slippery or uneven surfaces. Specific vision abilities required by this job include close vision, distance vision, color vision to discern color coded wires, peripheral vision, depth perception and ability to adjust focus.
Craft Recruiter Barnard Construction Co IncCraft RecruiterEl Paso, TXRanked by Engineering News-Record as one of the nations Top 400 civil contractors, Barnard specializes in dam construction and rehabilitation, power transmission and distribution, tunneling, inland marine, and large-scale utility, water, and pipeline projects. This role is project based and responsible for supporting the staffing needs of active and upcoming projects by recruiting field, professional, and project support personnel on aggressive timelines.
New["Craft Recruiter","Craft Recruiter"] BARNARD CONSTRUCTION["Craft Recruiter","Craft Recruiter"]El PasoRanked by Engineering News-Record as one of the nation's Top 400 civil contractors, Barnard specializes in dam construction and rehabilitation, power transmission and distribution, tunneling, inland marine, and large-scale utility, water, and pipeline projects. This role is project based and responsible for supporting the staffing needs of active and upcoming projects by recruiting field, professional, and project support personnel on aggressive timelines.
NewLaborer Kiewit CorpLaborerSanta Teresa, NMMay be required to use ladders/mechanical platforms/manlifts/scaffold to access required equipment/work areas (may exceed 200 feet), so must be able to climb and maintain balance on formwork, steel formwork, stairs, ladders and scaffolds. The person in this position needs to constantly move about a construction/industrial site, so should be able to stand, walk, sit, reach, stoop, kneel, crouch, and/or crawl.
General Laborers Mgc Contractors IncGeneral LaborersEl Paso, TXThe stamina to maintain attention despite interruptions, ability to lift, push, pull, carry, handle or feel objects, supplies, tools, machinery and/or controls weighing up to 50 pounds and reach with hands and arms; climb stairs and/or ladders; balance, bend, stoop, kneel, crouch, crawl, lift overhead, traverse around or otherwise position one's self around the required work and safety requirements to navigating and perform activities on various construction sites in a safe manner. We specialize in all forms of water and wastewater general contracting including Job Order Contracting, Construction Manager at Risk, Design-Bid-Build, and Design-Build throughout Arizona, Texas, Utah, and New Mexico.
Parking Lot Layout & Striping Technician Straight Edge ContractorsParking Lot Layout & Striping TechnicianEl Paso, Texas$16–$20Parking Lot Layout & Striping Technician About Us We are a growing asphalt and concrete contractor specializing in high-quality pavement maintenance, parking lot striping, signage, and site improvements. If you have experience laying out and striping parking lots and want to join a growing company that values quality workmanship, we'd like to hear from you.
Traveling Safety Manager - CHST Required B&B ConcreteTraveling Safety Manager - CHST RequiredEl Paso, TexasThis will include, but is not limited to, assisting in development of a zero injury safety culture on each project, conducting at least weekly documented jobsite safety inspections, effectively communicate orientations for all new project workers, assist with and review subcontractor daily pre-task safety analysis, actively promote and participate in daily stretch and flex program, identify project trends and execute proactive safety initiatives to eliminate incidents, support corporate goals and initiatives, emphasize and support proactive safety such as near miss/hazard reporting, coach and recognize workers on safe work methods, report all incidents in an effective and timely manner following established protocols and be a champion in motivating workers to perform their jobs safely! Ensure that each subcontractor designates a safety representative that is properly trained in subcontractors scope of work and has the proper authority to correct safety issues.
Traveling Bilingual Safety Manager B&B ConcreteTraveling Bilingual Safety ManagerEl Paso, TexasThis will include, but is not limited to, assisting in development of a zero injury safety culture on each project, conducting at least weekly documented jobsite safety inspections, effectively communicate orientations for all new project workers, assist with and review subcontractor daily pre-task safety analysis, actively promote and participate in daily stretch and flex program, identify project trends and execute proactive safety initiatives to eliminate incidents, support corporate goals and initiatives, emphasize and support proactive safety such as near miss/hazard reporting, coach and recognize workers on safe work methods, report all incidents in an effective and timely manner following established protocols and be a champion in motivating workers to perform their jobs safely! Ensure that each subcontractor designates a safety representative that is properly trained in subcontractors scope of work and has the proper authority to correct safety issues.
NewSafety Manager - Santa Teresa (34265) CEC Facilities GroupSafety Manager - Santa Teresa (34265)Santa Teresa, NMThe Safety Manager is responsible for managing the divisions safety coordinators and senior safety coordinators in the areas of audits, incident investigations, and day-to-day operations of projects. Provide guidance and feedback to project leadership, including but not limited to Project Managers, APMs, site managers, Superintendents, Forman, and team leads.
Safety Manager (33601) CEC Facilities GroupSafety Manager (33601)El Paso, TXThe Safety Manager is responsible for managing the divisions safety coordinators and senior safety coordinators in the areas of audits, incident investigations, and day-to-day operations of projects. Provide guidance and feedback to project leadership, including but not limited to Project Managers, APMs, site managers, Superintendents, Forman, and team leads.
Traveling Laborer Journeyman DnTraveling Laborer JourneymanEl Paso, TexasWe have built over 3,500 pre-stressed concrete liquid storage tanks over the past 90 years around the country and world, as a result we have become the leader in the industry when it comes to quality and innovation. The laborer journeyman shall set the pace of work and assist other local workers with knowledge and guidance for performing the work safely and with quality.
Traveling Carpenter Journeyman DnTraveling Carpenter JourneymanEl Paso, TexasOur carpenters set the pace of work, assisting other local workers with knowledge and guidance for performing the work safely and with quality, and help us keep the world's most precious resource safe. We have built over 3,500 pre-stressed concrete liquid storage tanks over the past 90 years around the country and world, as a result we have become the leader in the industry when it comes to quality and innovation.
Electrical Assistant Project Manager I (34017) CECElectrical Assistant Project Manager I (34017)El Paso, TXThis position is responsible for assisting teams in the construction of projects and ensuring project quality, schedule, cost control, safety, and customer objectives are met. Performs other related duties as assigned to ensure efficient and effective processes, completion of projects and smooth operation of department.
NewSafety Manager - Santa Teresa (34265) CECSafety Manager - Santa Teresa (34265)Santa Teresa, NMThe Safety Manager is responsible for managing the divisions safety coordinators and senior safety coordinators in the areas of audits, incident investigations, and day-to-day operations of projects. Provide guidance and feedback to project leadership, including but not limited to Project Managers, APMs, site managers, Superintendents, Forman, and team leads.
Concrete Foreman Southland HoldingsConcrete ForemanEl Paso, TXMust understand basic concrete principles such as concrete mix designs, admixtures, curing, cold and hot weather procedures for concrete placing and finishing, formwork systems, as well as concrete calculations for pours. Provides day-to-day direction on-site to project resources and ensures the project teams are provided with the resources and support that enables the teams to reach their goals.
NewLaborer (Recycler) Supervisor White House USALaborer (Recycler) SupervisorFort Bliss, TX$32.93–$38.35 / hourTo be employed by the Architect of the Capitol in a paid position, an individual must meet one of the categories below: A citizen of the United States; A person who is lawfully admitted for permanent residence and is seeking citizenship as outlined in 8 U.S.C. 1324b(a)(3)(B); A person who is admitted as a refugee under 8 U.S.C. 1157 or is granted asylum under 8 U.S.C. 1158 and has filed a declaration of intention to become a lawful permanent resident and then a citizen when eligible; A person who owes allegiance to the United States (nationals of American Samoa, Swains Island, and the Northern Mariana Islands, and nationals who meet other requirements described in 8 U.S.C. 1408); or. The position serves as the Laborer (Recycler) Supervisor and is responsible in the assigned unit for assigning, directing and reviewing the work of subordinates and evaluating their work performance; planning, scheduling and coordinating work operations; and solving problems related to the work performed by the Night Labor and Recycling Unit of the HOB to which assigned.