Following a $45 million expansion announced in 2025, the Madison site has significantly increased capacity, added new equipment, and created approximately 200 highly skilled biohealth jobs, further strengthening its role within Catalent’s global biologics network and Wisconsin’s growing life sciences ecosystem. Located at 726 Heartland Trail in Madison, the approximately 102,700‑square‑foot GMP facility specializes in mammalian cell line engineering, drug substance biomanufacturing, and biopharmaceutical development, utilizing flexible single‑use systems to enable rapid scale‑up and customization.