li>Perform footing subgrade inspections to review soils composition and bearing capacity and/or determine depth of overexcavation for unsuitable subgrade soils; Earthwork oversight (monitoring overexcavation of unsuitable materials and compaction testing of structural fill material); Communicate effectively and efficiently with contractors and project manager. - While performing the duties of this job, the employee is occasionally required to stand; sit, walk, climb, balance, stoop, kneel, crouch or crawl; use hands to finger, grasp, or feel objects; reach with hands and arms; push or pull; talk and hear; use repetitive motions.