Staten Island, NY30+ days ago
Re-cable Fibers cables between existing and new Baseband On field support and troubleshooting as needed of the existing technologies that are being migrated with in relocated BBU Call test to be performed a minimum of 110 yards from the site to ensure the call is being setup on the correct antenna face Functional Call test SRS Call test all simulated options Internal alarm test Record result in eNode B Acceptance Checklist De-Install Baseband Modules including mounting hardware as directed by T-Mobile Removal/disposal of unnecessary cabling & conduits Transport & dispose as directed by T-Mobile Submit COP - Upload CoP to project management repository TOR, Labeled photographs with: Site Id, equipment, termination point, etc. per project requirements, Completed RBS Installation Quality Checklist, Bill of Materials, Asset Tracking Form, Pre & Post Equipment installation pictures, pictures of conduit and conductor installation, corrected punch list items etc. Includes scanning, uploading to the TOR (i.e Cats Lite) and filling out asset tracking form as required Install T-Mobile provided Baseband Modules in existing cabinet including mounting hardware Install or swap T-Mobile provided SFP's on Basebands Install transport cable from each new Baseband and existing basebands to CSR/IXRe Install inter-cabinet connectivity kit between existing cabinet and new cabinet from Basebands to CSR Install IDL cables (if required) between Basebands and CSR/IXRe Confirm connectivity & functionality Terminate associated power, fiber, alarm and ground cables Grounding Tagging, labelling, and cable management Non-Smart Laptop Configuration & Integration (Enhanced Easy or latest tool to be used) Verify the correct SFP are installed if accessible Migrate technologies from up to (3) Existing baseband to (2) proposed baseband Move carriers one at the time or all at once depending on the market or region requirements.