Key Systems/Tools: 20-ton overhead bridge cranes, 480V electrical systems, Allen-Bradley PLCs, lifting and rigging equipment (forklifts, scissor lifts), HVAC/mechanical systems, basic shop equipment (tables, bandsaws). Facilities & Install: Drive heavy facilities work (mechanical, electrical, plumbing) to get the shop ready, followed by assisting in the installation and commissioning of new manufacturing equipment.