ASSEMBLY OF POLE: Removing straps from coils; installation strand and spiral; installation of chucks on strand; marking hole patterns; cut cable; skill saw operation; marking poles; untangle spiral; tightening rebar; verify mold; cutting slacks with chop saw; inserting slacks; tying slacks; plate inspection; installation of 8mm wire, chucks on 8 mm wire, strand and spiral wire, structure rings, ground wire, ground tanks and rings, proper use of tie gun; sequence it takes to assemble a cage safely; recognizing the materials needed to assemble a cage; pull spiral to proper pitch; detention strand; wire puller; pulling and installing rings. CABLE PULLING: Verifying the strand, pulling the strand and placement into tip tension plate, pulling cable, cutting the strand, and placing the strand at the base tension plate.