Working depth across data center infrastructure: power architecture (utility feeds, generators, UPS, switchgear, PDU, busway), cooling including liquid cooling for high density deployments, structured cabling and fiber plant, and commissioning level structures from factory acceptance through integrated systems testing. Own the design and build layer of the integrated schedule for your campus: critical path logic, gate milestones, interlocks between whitespace design and facility design freeze, long lead procurement commitments, and fit-out sequencing in completed zones.