p>MATERIAL: Turbines, gearboxes, oil sumps, forced draft flowers, heat exchangers, turbine generators, valves and control equipment, hardware, water, oil, sulfuric acid, salt, caustic soda, treatment chemicals, rust inhibitor, preservatives, test kits, paper, rags, tape.
Minimum 3 years experience operating and monitor test facilities such as pumps, valves, low pressure steam generating equipment and associated auxiliaries (feed water system, cooling water, and condensate system, etc.) heat exchangers and water treatment units to maintain the power, steam, water, and oil required to static test product.