university park, PA30+ days ago
Use specialized tools and equipment such as, but not limited to, phase sticks, high pot, relay test sets, fault indicators (thumper), motor test sets, rotation meters, meggar, ground test set, oil test set, TTR test set; safety-related testing equipment, variable speed drives, etc., to perform necessary work. Install and wire equipment such as distribution or portable generators, motors, electronic equipment, frequency drives, combustion turbine, special lighting and wiring, stage lighting, street lighting; install conduit, making bends, threading and reaming where necessary; install intelligent high voltage selector switches as necessary.