Construction Scheduler

Foster CM Group, Inc
  • Dallas, TX
  • Instant Apply
30+ days ago

Job Description

About Foster CM Group
At Foster CM Group, we believe in building more than just projects—we build careers. As a leading program and construction management firm, we invite you to explore exciting opportunities to grow with us. Visit our website to learn more about who we are and the impactful projects we've delivered across the country.

Founded in 1992, Foster CM Group Inc. has over 30 years of experience providing top-tier program and construction management services. We proudly serve clients in Aviation, Education (K–12 and Higher Ed), Government (City, State, and Federal), Healthcare, Sports & Entertainment, Transportation, and Water/Wastewater sectors.

We are seeking an experienced Construction Scheduler for a full-time position located in our Dallas, Texas office.

As a Construction Scheduler, you'll take the lead in developing, analyzing, and optimizing complex project schedules across a wide range of construction initiatives. You will play a critical role in ensuring on-time and on-budget delivery by working hand-in-hand with engineers, contractors, consultants, and internal stakeholders.

The candidate should have experience with industry standard best practices for utilizing Primavera P6. The preferred candidate will have strong knowledge of scheduling principles, critical path method (CPM) scheduling, and risk analysis techniques

Essential Job Functions:
  • Assist in implementing project planning and scheduling strategy, plans and procedures.
  • Assist in coordinating the development and implementation of project Work Breakdown Structures (WBS) and Cost Breakdown Structures (CBS) in coordination with Project Leads, Cost Engineers, and Contractor Project Leads.
  • Build baseline CPM schedule.
  • May assist with preparing contract time determinations based on plans and specifications.
  • Assist with evaluating cost and/or resource loaded planning schedules.
  • Assist in evaluating baseline and monthly schedule submittals for compliance with contract specifications. Evaluating deviations from the baseline.
  • Monitor and track construction schedule progress by conducting project schedule analysis, critical path analysis and schedule risk analysis.
  • Identify schedule activities that control the overall construction time or project's critical path.
  • Identify and measure the impact changes have on project schedules by conducting Time Impact Analyses (TIA). Also, able to evaluate TIAs submitted by others.
  • Provide recommendations to resolve the time, scope, and cost aspects of project changes or delays.
  • Plan night work windows, shutdowns, gate closures
  • Coordinate with airport operations to minimize disruption
  • Prepare technical reports to communicate findings and recommendation.
  • Performs other job responsibilities as assigned.

Minimum Qualifications:
  • Bachelor's degree in Engineering, Construction Management, or comparable practical experience preferred (other degree and/or experience will be considered in lieu of degree)
  • 3-8 years of scheduling principles, critical path method (CPM) scheduling, and risk analysis techniques.
  • 5-10 years of scheduling experience on aviation-related construction projects.
  • Experience interpreting and analyzing construction drawings, specifications, and contract documents.
  • Familiarity with Schedule Analyzer or similar schedule analytics software.
  • Strong interpersonal skills with the ability to collaborate across multidisciplinary teams.
Foster CM Group Benefits (benefit package which includes both employer and employee paid plans):
  • Medical Insurance to include HSA and FSA benefits
  • Dental Insurance
  • Vision Insurance
  • Prescription Drug
  • Telehealth Benefits
  • Life Insurance
  • STD paid by the Company
  • LTD paid by the Company
  • Employee Assistance Program (EAP)
  • 401 (K) with Company Match
  • Vacation
  • Holidays
  • Paid Time Off (PTO)
  • Financial Wellness
  • Pet Insurance

Work Environment:
  • The work environment characteristics described here are representative of those an employee encounters while performing the essential functions of this job. While performing the duties of this job, the employee is regularly exposed to moving machinery & mechanical parts, uneven ground, exposure to dust, gas or fumes, exposure to loud noise, and outside weather conditions.
Physical Requirements:
  • The physical requirements must be met by an employee to successfully perform the essential functions of this job. Intermittent unassisted sitting, walking, standing, bending, squatting, climbing, kneeling, twisting, stooping, crawling, pushing and lifting is required. Must be able to walk and/or stand for prolonged periods of time for at least eight hours per day. The employee must frequently lift and/or move light equipment up to 50 pounds without assistance. Must be alert to equipment in the field, occasional need to work near hazardous equipment and machinery, ability to walk on uneven ground while physically maneuvering construction sites, ability to work in extreme temperatures or humidity, and potentially work at heights.
Other Requirements:
  • Possession of a valid state of residence driver's license with a clean driving record.
  • Daily travel to and from construction sites, generally within 100 miles from the home office is expected. Short term, out of town, assignments may be required. Long term, out of town, assignments may be required, with advance notice of planned dates.
  • May be required to work protracted and irregular hours to meet client's needs, including nights, overtime and weekends.
  • All positions at Foster CM Group require an applicant who has accepted an employment offer to undergo a background check. Background checks may include, SSN/SIN validation, education verification, employment verification, criminal background check, fingerprint verification, and/or drug test. All employment offers are contingent upon successful results of required background checks.
Foster CM Group Benefits (benefit package which includes both employer and employee paid plans):
  • Medical Insurance to include HSA and FSA benefits
  • Dental Insurance
  • Vision Insurance
  • Prescription Drug
  • Telehealth Benefits
  • Life Insurance
  • STD paid by the Company
  • LTD paid by the Company
  • Employee Assistance Program (EAP)
  • 401 (K) with Company Match
  • Vacation
  • Holidays
  • Paid Time Off (PTO)
  • Financial Wellness
  • Pet Insurance
Foster CM Group, Inc. is an Equal Opportunity Employer. This means that Foster CM Group does not discriminate on the basis of race, religion, sex (gender), age, disability, national origin, genetic information, or sexual orientation. All individuals are encouraged to apply and compete for jobs.

#LI-Onsite

#ZR

Numbers & Facts

LocationDallas, TX

Skills

  • Airport Managementunmatched
  • Analysis Skillsunmatched
  • Analysis Softwareunmatched
  • Aviation Industryunmatched
  • Background Investigationunmatched
  • Baseline Scheduleunmatched
  • Best Practicesunmatched
  • Budget Managementunmatched
  • Calendar Managementunmatched
  • City Governmentunmatched
  • Communication Skillsunmatched
  • Constructionunmatched
  • Construction Controlunmatched
  • Construction Drawingsunmatched
  • Construction Engineeringunmatched
  • Construction Managementunmatched
  • Construction Projectsunmatched
  • Construction Scheduleunmatched
  • Contract Analysisunmatched
  • Contract Creationunmatched
  • Contract Requirementsunmatched
  • Cost Engineeringunmatched
  • Critical Path Methodunmatched
  • Cross-Functionalunmatched
  • Dental Insuranceunmatched
  • Driver's Licenseunmatched
  • Employee Assistance Planunmatched
  • Healthcareunmatched
  • Higher Educationunmatched
  • Industry Standardsunmatched
  • Insuranceunmatched
  • Interpersonal Skillsunmatched
  • Life Insuranceunmatched
  • Lift/Move 50 Poundsunmatched
  • Physical Demandsunmatched
  • Prescription Drugsunmatched
  • Primaveraunmatched
  • Project Developmentunmatched
  • Project Evaluationunmatched
  • Project Planningunmatched
  • Project Scheduleunmatched
  • Project/Program Coordinationunmatched
  • Reporting Skillsunmatched
  • Risk Analysisunmatched
  • Sportsunmatched
  • Strategic Planningunmatched
  • Team Playerunmatched
  • Telehealthunmatched
  • Time Managementunmatched
  • Vision Planunmatched
  • Willing to Travelunmatched
  • Work Breakdown Structure (WBS)unmatched

Level up your application

Professional resume templates

Browse dozens of recruiter approved resume templates, layouts and formats. Choose your favorite and make it your own in minutes.

Free resume templates

Resume Builder

Improve your existing resume or start from scratch and create a standout, ATS-friendly resume. Add job-specific content, download and apply.

Resume Builder