Gables Search Group logo

Sr. Electrical Estimator – Industrial EPC & Data Center Construction

Gables Search Group
  • Houston, TX
  • $150,000–$180,000
  • Instant Apply
9 days ago

Job Description

Sr. Electrical Estimator – Industrial EPC & Data Center Construction

Location: Houston, TX

Fully onsite. 40-45 hours week M - F.

Position Overview

We are seeking an experienced Electrical Estimator to support a growing portfolio of large-scale construction projects, primarily within the rapidly expanding data center market. Additional projects span the chemical, petrochemical, oil and gas, and other heavy industrial sectors.

This position offers the opportunity to work on complex electrical construction projects nationwide, collaborating with engineering, procurement, and construction teams to develop accurate and competitive estimates.

Prior data center experience is not required. We are interested in electrical estimators with strong technical construction backgrounds who can bring their expertise to this growing sector.

Key Responsibilities

  • Prepare detailed electrical and instrumentation estimates for complex construction projects.

  • Review drawings, specifications, and bid documents to determine project scope and requirements.

  • Perform quantity takeoffs and calculate material, labor, equipment, and subcontractor costs.

  • Evaluate supplier and subcontractor quotations for accuracy and competitiveness.

  • Collaborate with engineering, procurement, and construction teams throughout the bidding process.

  • Analyze labor productivity, material pricing, and project-specific cost considerations.

  • Participate in pre-bid meetings, site visits, and project walkdowns.

  • Develop proposal documentation and final bid packages.

  • Maintain historical cost data and support improvements in estimating accuracy.

Qualifications

  • Electrical construction estimating experience within industrial, commercial, EPC, or mission-critical construction.

  • Ability to interpret electrical drawings, specifications, and construction documents.

  • Knowledge of electrical materials, installation methods, and construction labor requirements.

  • Experience with quantity takeoffs, cost estimating, and subcontractor bid evaluations.

  • Proficiency in Microsoft Excel; familiarity with Bluebeam, McCormick, Accubid, or similar estimating software preferred.

  • Strong analytical, organizational, and communication skills.

  • Bachelor's degree in Engineering, Construction Management, or a related field preferred, not required.

  • Data center construction experience is a plus, not required.

  • Ability to work independently and travel nationwide as needed.

Compensation & Benefits

  • Competitive salary based on experience.

  • Competitive per diem for project-related travel.

  • Comprehensive medical, dental, and vision insurance.

  • 401(k) with immediate company matching and vesting.

  • Health savings and flexible spending account options.

  • Short-term and long-term benefits.

  • Employee discount programs.

Why Consider This Opportunity?

Join an established engineering and construction organization expanding its presence in the data center market. Apply your electrical estimating expertise to major infrastructure projects, nationwide project opportunities, and the resources of a well-established organization.

Numbers & Facts

LocationHouston, TX
IndustryStaffing/Employment Agencies
Salary$150,000–$180,000
Company Size50 to 99 employees
Year Founded2002
Websitehttps://www.gablessearch.com/

About Company

Gables Search Group headquartered in Cleveland, Ohio has been a leader in search and placement nationwide since 2002.  Our company specializes in both direct and contract (temporary) staffing in all industries and disciplines.

At Gables Search Group, we connect exceptional professionals with outstanding organizations.  Our commitment to integrity, excellence, partnership, innovation, and respect sets us apart. With a personalized approach to recruitment, we ensure the perfect match between candidates and employers.

Whether you are a talented professional seeking new opportunities or an organization looking to build a high-performing team, Gables Search Group is here to guide you through the journey. Our success is built on the success of our clients and candidates, and we are dedicated to making a positive impact on the careers and businesses we serve.

Skills

  • Analysis Skillsunmatched
  • Bid Analysisunmatched
  • Bid Packagesunmatched
  • Biddingunmatched
  • Communication Skillsunmatched
  • Compensation and Benefitsunmatched
  • Constructionunmatched
  • Construction Engineeringunmatched
  • Construction Estimatesunmatched
  • Construction Managementunmatched
  • Construction Projectsunmatched
  • Cost Estimatesunmatched
  • Dental Insuranceunmatched
  • Documentationunmatched
  • Electricityunmatched
  • Energy Performance Certificate (EPC)unmatched
  • Engineering Procurement and Construction (EPC/EPCC/EPCM)unmatched
  • Historical Cost Principleunmatched
  • Instrumentationunmatched
  • Material Take Offunmatched
  • Microsoft Excelunmatched
  • Network Operations Centerunmatched
  • Oil and Gasunmatched
  • Organizational Skillsunmatched
  • Petrochemicalsunmatched
  • Pricingunmatched
  • Project Estimatesunmatched
  • Proposal Developmentunmatched
  • Vision Planunmatched
  • Willing to Travelunmatched

Level up your application

Professional resume templates

Browse dozens of recruiter approved resume templates, layouts and formats. Choose your favorite and make it your own in minutes.

Free resume templates

Resume Builder

Improve your existing resume or start from scratch and create a standout, ATS-friendly resume. Add job-specific content, download and apply.

Resume Builder