Maintain a current and complete log of all intended design modifications, listing the primary system, affected systems, potential or named engineering contractors, contractors’ points of contact, servicing agencies information, intended installation windows, hull applicability and maximum equipment lead times. Conduct studies and analyses, such as weight studies, arrangement studies, distributed system checks, electrical load analysis updates, and safety/human factor engineering studies to better determine the complete scope of performance, configuration, and ILS impacts.