Reporting to the President of Global Power Land Infrastructure, you will own construction execution for high-density AI campuses, new builds, and retrofits, from site diligence and design through energization, Level 1-5 commissioning, and turnover to operations, with accountability for safety, schedule, cost, and quality on every site. The ideal candidate has delivered hundreds of megawatts of critical capacity from the owner's side at a hyperscaler or AI infrastructure company, has delivered liquid-cooled AI data halls, and can run several sites at once without losing control of cost or schedule.