Construction Scheduler The Superior GroupConstruction SchedulerColumbus, OH$75,000–$95,000 / yearSuperior is a national leader in electrical design and construction and among the largest electrical contractors in the U.S. From hospitals to data centers to corporate campuses and beyond, we bring power and connectivity to projects of every shape and size. Required: You have earned a Bachelor's degree in Construction Management, Engineering, or a related field, or possess experience equivalent to a Bachelors degree in these fields.
Construction Scheduler Embark Recruiting SolutionsConstruction SchedulerColumbus, OhioExperience developing detailed resource loaded design and construction schedules, and preparing progress/status reports and performance of earned value analysis. Critical Path Method (CPM) scheduling knowledge/experience and the ability to analyze schedules to determine duration and logic issues.
Construction Scheduler Ace Electric IncConstruction SchedulerPlain City, OHSince our inception in Valdosta, GA in 1975, Ace has been performing quality electrical installations in a full range of markets including: commercial, mission critical, education, healthcare, institutional, industrial, correctional facilities, hospitality, military bases, retail and others. Working Conditions: Work in a climate-controlled office setting with varying degrees of stress and time Considerable amount of time making repetitive Considerable amount of time Considerable amount of time using telephone and Sounds and noise levels may be distracting or Travel to job sites up to 25%.
Construction Scheduler Holder ConstructionConstruction SchedulerColumbus, OhioCreate, maintain, and edit layouts in Primavera P6 to efficiently update schedules, generate reports, and analyze critical paths. Build and manage baseline schedules using CPM best practices, including detailed WBS for schedules with 2,500+ activities.
Construction Senior Project Scheduler The Superior GroupConstruction Senior Project SchedulerColumbus, OH$100,000–$130,000 / yearSuperior is a national leader in electrical design and construction and among the largest electrical contractors in the U.S. From hospitals to data centers to corporate campuses and beyond, we bring power and connectivity to projects of every shape and size. Superior is part of MasTec (NYSE: MTZ), a Fortune 500 company and a large-scale infrastructure builder with deep experience across power delivery and generation, energy, communications, and heavy civil sectors.
Construction Scheduler – T&D/Substation - Columbus, OH Quanta Infrastructure Solutions Group, LLCConstruction Scheduler – T&D/Substation - Columbus, OHColumbus, OhioRemoteFull timeThis role is responsible for developing and maintaining resource- and cost-loaded P6 schedules , performing critical path analysis , forecasting schedule impacts, and partnering closely with project teams to drive successful project execution from planning through completion. The QISG team brings together Engineering, Safety, Quality, Material Procurement, QA/QC, Right-of-Way Acquisition, Scheduling, Environmental Planning, Permitting, Title and Land Management expertise that ensure outstanding results for our clients.
Construction Project Scheduler Everus Construction GroupConstruction Project SchedulerColumbus, OhioEverus Construction Group, Inc. and our subsidiaries do not work with any third-party recruiters or agencies without a valid signed agreement and partnership with the Corporate Human Resources Team. JOB SUMMARY Plan, creates, and manages project schedules in collaboration with technical experts, project leads, and project managers.
Construction Project Scheduler E.S.I., IncConstruction Project SchedulerColumbus, OHPart timeEverus Construction Group, Inc. and our subsidiaries do not work with any third-party recruiters or agencies without a valid signed agreement and partnership with the Corporate Human Resources Team. JOB SUMMARY Plan, creates, and manages project schedules in collaboration with technical experts, project leads, and project managers.
NewConstruction Planner/Scheduler Bechtel CorpConstruction Planner/SchedulerNew Albany, OHExtraordinary teams building inspiring projects: Since 1898, we have helped customers complete more than 25,000 projects in 160 countries on all seven continents that have created jobs, grown economies, improved the resiliency of the world''s infrastructure, increased access to energy, resources, and vital services, and made the world a safer, cleaner place. The role interfaces with Construction, Field Engineering, Engineering, Procurement, Materials Management, Subcontracts, Project Controls, and Client teams to ensure a logical, resource-driven path from engineering release and material availability through fabrication, delivery, and field installation aligned to construction sequence and turnover objectives.
Project Scheduler Gray IncProject SchedulerColumbus, OH$100,000–$130,000 / yearThe candidate will also work with the Lead Project Scheduler and the project team to review two-to-three-week lookahead schedules for accuracy and construction sequencing, to evaluate and communicate construction critical path(s) to the project team, trader partners, and the Customer, and to help evaluate and communicate the impact of Customer decisions, design delays, and trade partner progress on the project schedule to mitigate critical path delays and prepare time impact analyses (TIAs) as required. The candidate will work with the Lead Project Scheduler to evaluate construction sequencing, help the project team plan efficient workflows, assist in planning and sequencing work relative to the project schedule, assist with the assessment of project schedules to identify and mitigate scheduling conflicts and compression and assist in reviewing schedules from a safety perspective, helping to identifying potential safety concerns and incorporating mitigation points where applicable.
Project Scheduler Michael Page InternationalProject SchedulerColumbus, Ohio$120,000–$170,000 / yearFull timeOwn schedules for major 69-500kV projects using top tools like P6 and Power BI.A boutique, high-caliber engineering and infrastructure partner, this firm delivers utility-grade technical excellence with the responsiveness and personal touch of a close-knit team. Known for its deep expertise in transmission, substation, and distribution projects, the company pairs senior multidisciplinary talent with an agile, hands-on approach-offering Fortune-500-level capability in a smaller, relationship-driven environment.
Project Scheduler Staff Manifest SolutionsProject Scheduler StaffNew Albany, OHResponsible for the development of junior level schedulers on the following: preparing and analyzing metric reports; preparing and analyzing schedule risk; developing what-if schedules to address various scenarios and options as necessary; crashing scope of work schedule durations; following processes and handbook procedures; and all aspects of scheduling within the assigned systems and software. Provide input and guidance to schedulers in the development of fully integrated system schedules (including resource loading and leveling) for schedules that utilize critical path methodology based on work scope from the work packages and planners work list.
Project Scheduler P6 CBRE Group IncProject Scheduler P6New Albany, OHIn addition, the Project Planner assists with establishing and executing a framework for tracking and allocating planned and actual budget data to enable improved project planning and site level forecasting activities using Earned Value Management processes and metrics. The Project Planner is a key member of the project team working directly with the project managers to define project goals and objectives; create and maintain a project budgets and schedules and assist with project analysis and continuous process improvement.
Project Scheduler Staff American Electric PowerProject Scheduler StaffNew Albany, OhioResponsible for the development of junior level schedulers on the following: preparing and analyzing metric reports; preparing and analyzing schedule risk; developing what-if schedules to address various scenarios and options as necessary; crashing scope of work schedule durations; following processes and handbook procedures; and all aspects of scheduling within the assigned systems and software. Provide input and guidance to schedulers in the development of fully integrated system schedules (including resource loading and leveling) for schedules that utilize critical path methodology based on work scope from the work packages and planners work list.
Columbus Ohio - Senior Project Scheduler StelicColumbus Ohio - Senior Project SchedulerColumbus, OhioYou will ensure that critical path activities are accurate, coordinated, and supported by clear logic and field-validated data. This role leads schedule development, progress integration, risk analysis, and reporting across design, procurement, construction, and commissioning.
NewProject Scheduler Staff UNICON International, Inc.Project Scheduler StaffNew Albany, OHResponsible for the development of junior level schedulers on the following: preparing and analyzing metric reports; preparing and analyzing schedule risk; developing what-if schedules to address various scenarios and options as necessary; crashing scope of work schedule durations; following processes and handbook procedures; and all aspects of scheduling within the assigned systems and software. 2. Provide input and guidance to schedulers in the development of fully integrated system schedules (including resource loading and leveling) for schedules that utilize critical path methodology based on work scope from the work packages and planners work list.
NewProject Scheduler Integrated Talent StrategiesProject SchedulerNew Albany, OHIn this role, you'll build and maintain project schedules in Primavera P6, work closely with project managers and field teams, track project progress, identify potential delays, and help keep projects moving forward. Integrated Talent Strategies (ITS) is a staffing and recruiting firm specializing in engineering, technical, and professional positions.
Project Scheduler Manifest SolutionsProject SchedulerColumbus, OHMentor and train junior level schedulers on the following: preparing and analyzing metric reports; preparing and analyzing schedule risk; developing what-if schedules to address various scenarios and options as necessary; crashing scope of work schedule durations; following processes and handbook procedures; and all aspects of scheduling within the assigned systems and software. Develop fully integrated system schedules (including resource loading and leveling) for complex and intermediate scope of work execution teams including detailed system schedules that utilize critical path methodology based on work scope from the work packages and planners work list.
Project Scheduler (Remote) SOLV Energy LLCProject Scheduler (Remote)OHRemote$91,520–$114,400 / yearIn addition, candidate introductions or resumes can only be submitted to our internal talent acquisition recruiting team if a signed vendor agreement is already on file and the third-party recruiter or agency has received formal instructions from our internal talent acquisition team to submit candidates for a particular job posting. SOLV Energy is a leading provider of infrastructure services to the power industry, designing, building and maintaining utility scale solar, battery storage and high voltage substation projects nationwide.
Lead Scheduler Kokosing Construction Company IncLead SchedulerColumbus, OHAbility to work with mixed levels of operations, clients, designers and trade partners to build out master schedules, provide critical schedule analysis, and provide team with suggested adjustments to improve schedule outcome. Have a firm understanding of construction sequencing and duration - ability to work independently or with a project team to develop schedules ranging from summary level to detailed activity / resource loaded.