Underground Construction Scheduler Barnard Construction CompanyUnderground Construction SchedulerBozeman, MTExperience may include rail and roadway tunnels, utility tunnels, hydroelectric tunnels, underground mining, and the use of tunneling excavations methods including TBMs, SEM, or drill and blast. The incumbent will be responsible for the development and progressing of underground and tunnel construction project schedules for project estimates, projects in development, and active projects in the field.
Planner/Scheduler, Planner/Scheduler Sr. MDU Resources Group IncPlanner/Scheduler, Planner/Scheduler Sr.Glendive, MT$27.46–$34.32 / hourFour years' experience in project scope development with engineering and project management; project work breakdown structure development; project resource staffing, estimation and schedule loading; critical path reviews and schedule risk analysis and developing special project reports or equivalent experience. This position will be responsible for creation and revision of project schedules and reporting tools to maximize efficient utilization of company and contractor resources for successful completion of capital and maintenance projects.
Project Scheduler (Remote) SOLV Energy LLCProject Scheduler (Remote)MTRemote$91,520–$114,400 / yearIn addition, candidate introductions or resumes can only be submitted to our internal talent acquisition recruiting team if a signed vendor agreement is already on file and the third-party recruiter or agency has received formal instructions from our internal talent acquisition team to submit candidates for a particular job posting. SOLV Energy is a leading provider of infrastructure services to the power industry, designing, building and maintaining utility scale solar, battery storage and high voltage substation projects nationwide.
Project Controls Scheduler (Remote) SOLV Energy LLCProject Controls Scheduler (Remote)MTRemote$91,520–$114,400 / yearIn addition, candidate introductions or resumes can only be submitted to our internal talent acquisition recruiting team if a signed vendor agreement is already on file and the third-party recruiter or agency has received formal instructions from our internal talent acquisition team to submit candidates for a particular job posting. SOLV Energy is a leading provider of infrastructure services to the power industry, designing, building and maintaining utility scale solar, battery storage and high voltage substation projects nationwide.
Senior Scheduler - Michels Underground Cable, Inc Michels CorpSenior Scheduler - Michels Underground Cable, IncMissoula, MTInstalling underground cables for power transmission, power distribution, renewable energy and communication networks is a necessary step in hardening the electrical grid, delivering reliable communication networks, and integrating renewable energy into our existing systems. Bachelor's degree in Project Management, Construction Management, Engineering, or a related field -or an equivalent combination of education and 5+ years of relevant experience.
Senior Field Scheduler (Remote) SOLV Energy LLCSenior Field Scheduler (Remote)MTRemote$117,840–$147,300 / yearIn addition, candidate introductions or resumes can only be submitted to our internal talent acquisition recruiting team if a signed vendor agreement is already on file and the third-party recruiter or agency has received formal instructions from our internal talent acquisition team to submit candidates for a particular job posting. SOLV Energy is a leading provider of infrastructure services to the power industry, designing, building and maintaining utility scale solar, battery storage and high voltage substation projects nationwide.
Scheduler - Michels Underground Cable, Inc Michels CorporationScheduler - Michels Underground Cable, IncMissoula, MTInstalling underground cables for power transmission, power distribution, renewable energy and communication networks is a necessary step in hardening the electrical grid, delivering reliable communication networks, and integrating renewable energy into our existing systems. Bachelor's degree in Project Management, Construction Management, Engineering, or a related field -or an equivalent combination of education and 1-3 years of relevant experience.
NewConstruction Recruiter Barnard Construction CompanyConstruction RecruiterBozeman, MontanaFull timeRanked by Engineering News-Record as one of the nation’s Top 400 civil contractors, Barnard specializes in dam construction and rehabilitation, power transmission and distribution, tunneling, inland marine, and large-scale utility, water, and pipeline projects. This role is project based and responsible for supporting the staffing needs of active and upcoming projects by recruiting field, professional, and project support personnel on aggressive timelines.
Field Engineer Strobel Energy GroupField EngineerBillings, MTSubcontract Administration and Management: Assist in the assembly of drawings and specifications to support the process of obtaining bids from qualified subcontractors, with the support of the subcontracts group or site manager, select qualified candidates, and negotiating the subcontract. The role requires interfacing with all areas affected by the project including the client(s), engineering/design, subcontractors, distributors, vendors, and the ongoing strategic communication with project management regarding the status of the project.
Project Manager I - HVAC Equipment LONG Building Technologies IncProject Manager I - HVAC EquipmentBillings, MT4-year construction management/ engineering or mechanical degree or a 2-year technical degree and 2 years of project management experience (OR) 5 years of Commercial HVAC project management (OR) 6 years of HVAC equipment experience. This position involves overseeing the planning, design, ordering of the necessary equipment, and scheduling of the workforce assigned to a job to ensure that the project is implemented in a timely, efficient, and cost-effective manner while meeting the customer requirements within set deadlines.