Drive systems readiness ahead of volume in partnership with IT, engineering, and product data teams-ensure part numbers, BOMs, and routings are created and released in PLM (e.g., Agile) and ERP; MES process flows, operations, and data collection are configured (e.g., CAMSTAR); and labels, lot traceability, and shipping documentation are set up and validated at Fremont, Ipoh, and partner sites, so material can be started, tracked, and shipped without system-driven delays. Determine the full set of requirements for each ramp-equipment capacity and installation timing, operator and engineering resourcing, process readiness, process and equipment qualification, facility readiness, critical materials and consumables, substrates, tooling, and backend capacity-and drive each element to readiness ahead of required wafer starts and production volumes.