Also includes inspection of welding setups, excavations of defects, preparation and final welding using visual, magnetic particle, and liquid penetrant methods; inspection of received parts and components for dimensional accuracy; material conformity to specifications; and inspection of fiberglass/carbon fiber composite assemblies, both in-process and for final acceptance. Responsible for park wide quality control inspections and audits in one or more of the following areas: Dimensional conformity, fiberglass laminate construction (FRP)/carbon fiber composites, material specification conformity, mechanical and structural non-destructive testing (NDT), process specification conformity, receiving, and welding.