Rather than focusing solely on reactive break/fix field repairs, you will lead internal Factory Acceptance Testing (FAT) on the production floor, execute final Site Acceptance Testing (SAT) live at client facilities worldwide, and collaborate directly with design engineers to submit Engineering Change Requests (ECRs). Manage Controls & Logic Deployment: Perform PLC and HMI software downloads, verify logic parameters, and safely work inside high-voltage control panels, multi-axis industrial drives, and low-voltage sensor networks.