Verify controls turnover packages: as-built sequences of operation, point lists, control and network drawings, programming backups and configuration files under version control, licenses and credentials transferred to Hut 8, alarm setpoint and priority matrices, trend baselines, spare controllers and critical modules, and PM program inputs such as backup routines, firmware updates, and panel power health. Witness Level 3-5 commissioning of controls and automation: point-to-point verification, sequence- of-operations testing, controller, server, and network failover, alarm verification, trend validation, and integrated systems testing across mechanical, electrical, and controls, including loss-of- communication and loss-of-BMS scenarios.