June 23, 2026For U.S. Positions: While subject to change based on business needs, Leidos reasonably anticipates that this job requisition will remain open for at least 3 days with an anticipated close date of no earlier than 3 days after the original posting date as listed above.
Assist in Planning and Documenting the Receipt & Shipping Inspections, document & control any non-conformities, inspections of kitted material to verify conformance to requirements, assisting with evaluation of firmware to affirm it is up to date.
Inspection Q Box
The purpose of Q Box Inspection is to verify appropriate parts are contained within the kit, split the kit into sub-cell and cell components, and verify warning label, logos and other associated documentation correctness.
Inspection A Station
The purpose of the Inspection A Station is to inspect station appropriate fabric, tape type and location on parts, center cell preparation, tape shrinkage and tape stitch quality before any seam work is put in the article to be produced.