Much of the power and cooling equipment behind our next campuses - battery energy storage systems (BESS), grid-forming and grid-following inverters, solid-state transformers (SST), E-STATCOM and other power-quality devices, medium-voltage switchgear, UPS, and liquid-cooling systems - is either new to the market, new to the supplier, or being built at a volume the supplier has never shipped before. Plan and run prototype and pilot builds: define EVT/DVT/PVT scope and sample counts, witness builds, own test plans (type testing, HALT/HASS, thermal, EMC, protection coordination, functional and integration tests), and drive root cause and corrective action on every failure.