Lead future Anthro electrolyte and cell production lines expansion, specifying and buying of equipment with vendors and automation partners, weighing technoeconomic trade-offs on CAPEX and throughput, and driving layout, installation, commissioning, and ramp (SOP) to stable operation. Apply data-driven methods (SPC, Cp/Cpk, DOE, defect paretos), PFMEA, and control plans, together with lean/continuous-improvement, to improve process capability, de-bottleneck the line, and hit yield, throughput, OEE, and cost targets.