Cleaning up: About 45 minutes before the end of the workday, begin cleaning up the work areas by removing any loose protective materials such as drop clothes and plastic, vacuuming all floors, wiping down all hard surfaces, cleaning all paint tools, and returning all tools to their original location. Site preparation: Begin moving furniture and start applying protection materials such as masking tape, plastic, drop clothes, masking paper, floor coverings, etc.